Public Reel

gov.archives.arc.37058 · Beat 54 · permalink

Factory

20:08–21:18

Machine annotation by Qwen/Qwen3-VL-235B-A22B-Instruct, cut beats-0.2, prompt beats-0.2. Machine checks passed. 4 quotes checked against the transcript; 4 names checked for a spoken or on-screen source; no visible events claimed. Not human-reviewed. Observations and transcript may still be wrong.

Frame at 20:1120:11Frame at 20:1920:19Frame at 20:2520:25Frame at 20:5320:53

Play from 20:08 on the Internet Archive This passage on the film's page

Evidence and details

Starts here: pause in speech; cut falls inside a spoken line: no pause was available without exceeding the length cap. Sequence 24 · shots 198–201. Observations cite a frame (frame:n) or a time (t:m:ss); frames are the sampled ones above.

Place
(factory, interior) evidence: frame:1
People
  • man in light-colored work clothes, standing on a turbine, arms raised visible
  • man in light shirt and hard hat, standing near turbine visible
  • man in light shirt, back to camera, near turbine visible
  • man in straw hat and blue shirt, visible in foreground visible
Also said
“Hoover Dam had cost $175 million.” 20:42 · “Hoover Dam has fulfilled the hopes and expectations of those who envisioned this great reclamation project.” 21:02
Seen
large hydroelectric turbine, metal railings and walkways, turbine assembly with visible shaft and housing, row of identical turbines in long hall, hard hats and work clothes
Interpretation
Model opinion, not evidence: mood: documentary, factual, concluding; themes: engineering achievement, public infrastructure, cost and repayment of large projects; style notes: static wide shots of machinery, medium shots of workers, industrial lighting, no dramatic framing

The beat shows large hydroelectric turbines inside a power plant, with workers present during or after installation. The narration states that the Hoover Dam's N8 unit began operation in December 1961, completing the plant's expansion to 1.3 million kilowatts, and that the dam's cost is being repaid via power sales.

“N8 went on the line December 1st, 1961.” 20:19 · “and to complete the Hoover power plant.” 20:25 automatic transcript, may be wrong

The record

US Government work The record names a federal body as the creating agency. A work prepared by an officer or employee of the United States Government as part of that person's official duties has no US copyright (17 U.S.C. 105; before 1978, section 8 of the 1909 Act). This says nothing about copyright outside the United States, or about music, stock footage or other material the film may incorporate. Evidence dossier. The finding concerns the US copyright record for the film; it is not clearance for any use, and this page's annotation is machine output.

Share

Paste the permalink anywhere that shows link previews and it carries the frame, the time and the finding. The card image can be saved and used with a credit.

Frame from gov.archives.arc.37058 at 20:11 (passage 20:08–21:18); US record: US Government work

Permalink
always the current cut
Permalink to this version
warns if the beats are recut later
Card image
https://publicreel.org/cards/moment/gov.archives.arc.37058/b54.png
Figure for a newsletter or page
Cite